MTG Move To Germany UK → Germany relocation system
GUIDE

Moving to Germany from the UK: Step-by-Step Checklist

Moving to Germany from the UK works best when the move is handled in the right order. This checklist page combines the system guide with a practical move-plan tool so users can turn research into action.

Open planner

Use the planner to create your packing list and move from research into practical next steps.

20
Small move Flat Family home
Planning time

2–8 weeks

Transport time

3–10 days

Customs

Required

Biggest risk

Wrong sequence

Quick answers

What is the first step?

Start by deciding your move type, estimating volume and confirming whether your timing is flexible or fixed.

What causes delays most often?

Incomplete packing lists, missing documents and poor coordination between planning and customs preparation.

What should happen before the truck moves?

Your mover should already have the core file: packing list, identity details, residence proof and the customs declaration path.

How this checklist works

System first

Most pages list tasks. This checklist follows the real execution sequence of a UK to Germany move so you know what to do and when to do it.

Phase 1 covers planning and move setup before you request or confirm the move.

Phase 2 covers the file your mover needs in order to handle customs and transport correctly.

Phase 3 covers delivery and arrival checks.

Phase 4 covers the first administrative steps after you arrive in Germany.

CHECKLIST TOOL

Build your move plan in 30 seconds

Select the steps relevant to your move. The right panel turns your selections into a structured move plan with the next best action.

Planning
Select the steps relevant to your move.
Documents & customs
Delivery
Germany setup

Phase 1 — Planning your move

Move type and volume

Choose between shared load and direct transport.

Estimate your volume early so timing, routing and price make sense.

Your packing list starts here.

Timing and mover choice

Fixed dates reduce flexibility.

Choose a mover that handles UK → Germany customs regularly.

Confirm access conditions at both addresses early.

Create your packing list first

Your packing list is the foundation of both customs and transport. Build it in the planner before you move into form preparation.

Phase 2 — What your mover needs from you

Core move file

This is the most important stage of the move. The truck, customs file and final handoff depend on the inputs you provide.

The packing list is not just paperwork. It drives export, transit and German customs handling.

Most avoidable delays start here when the file is incomplete or inconsistent.

  • Detailed packing list
  • Proof of UK residence
  • Ownership and use of goods
  • Passport or ID copy
  • German address or registration details if available
  • Form 0350 pathway
CUSTOMS TOOL

Prepare your German customs declaration (Form 0350)

Once your packing list is in place, move into Form 0350 so your customs file can be prepared in the correct order.

  • Required for German customs clearance
  • Built from your packing list and move details
  • Takes 2–3 minutes. No registration required.

What happens next

Execution chain

This is the real order of operations once the file is complete.

01
Packing list
02
CDS / export
03
LRN / T1
04
German customs
05
Delivery

Packing list and file

The move starts with a clean item list and supporting documents.

Export and transit setup

Your mover prepares export and transit handling based on that file.

German clearance and delivery

Once the goods clear, final delivery can move forward on the German side.

Phase 3 — Delivery and arrival

On delivery day

Check access is ready.

Confirm the unloading plan.

Review the condition of key items.

After delivery

Check the inventory against the move file.

Raise missing or damaged items quickly.

Keep the customs handoff documents together.

Phase 4 — Setting up in Germany

First admin steps

After the goods arrive, Germany setup starts with registration.

Registration is the core dependency for the first practical setup steps in Germany.

Treat the move itself and the Germany setup as two linked phases, not one blurred process.

  • Complete your Anmeldung first
  • Your tax ID follows from registration
  • Banking and other services depend on registration status

Common mistakes

Underbuilding the file

Many moves slow down because the packing list, proof set or customs pathway is incomplete.

Treating the move as one single task

The strongest moves follow the sequence: plan, prepare the file, complete customs, deliver, then set up in Germany.

Ready to build your move plan?

Start with your packing list and move forward into customs only when the inventory is in place.